Solaris ExoStrong Compression Gauntlet Features
Solaris ExoStrong is made of:
- 84% Nylon
- 14% Lycra
- 2% TENCEL
ExoStrong Gauntlet is indicated for:
- Lymphedema
- Venous swelling
- Prevention of Deep Vein Thrombosis (DVT)
How to Use Solaris ExoStrong?
Donning Instructions:
- If using an Exo arm sleeve, always put it on before using the Exo glove or gauntlet.
- Slide the gauntlet over the hand. Adjust for comfort around the fingers.
Washing Instructions:
- Machine wash with mild detergent in warm water.
- DO NOT use bleach, fabric softeners, dryer sheets, or other additives
- Machine dry on permanent press.
- DO NOT iron.
Points to be taken care of while using Solaris Exo Garment:
- Put the Exo arm sleeve on as soon as user wake up. Thats usually when the arm or leg is at its smallest and when the garment will be the easiest to don.
- Make sure the arm or leg is dry before putting the garment on. A thin layer of talcum or baby powder may help.
- Use vinyl gloves, such as dishwashing gloves, while putting on the garment to prevent fingernail tears and make it easier to adjust.
- Take off watches and jewelry before putting the garment on. They can snag and tear the garment.
- Avoid sticking fingernails or other sharp objects into the material as this may cause damage to the garment.
- Don’t cut or pull loose threads. Cutting or pulling could cause a run in the fabric.
- Skin hygiene is important, put on a clean garment every day.
- Putting on compression garments can be frustrating, especially the first few times. Like all things, though, it will get easier with practice and patience.
Contraindications:
- Arterial insufficiency or degeneration
- Untreated congestive heart failure
- Systemic infection
- Impaired sensation
- Cognitive impairment
- Allergies or sensitivities to materials
Change the Solaris ExoStrong Garment if:
- The garment is slipping or falling down more frequently.
- It has become considerably easier to put on.
- Its been six months since user began wearing the garment.
With good care, the garment will need to be replaced in six months or less.








